Fishermen in traditional boats on Lake Kivu beneath green hills, eastern Congo

Flows

Thirteen ways material leaves the Kivus

Thirty-five sampled mine sites in six mining areas of North and South Kivu produce gold, tin, tantalum and tungsten. By mineral, area, scale, processing and routing they resolve into thirteen distinct flows. Every one of them leaves the country through the same two crossings into Rwanda. These are the channels our gate-and-plant model is built to replace.

Photo: Steve Evans (Citizen of the World) · CC BY 2.0 · Wikimedia Commons

The picture in one map

Two corridors carry everything

All thirteen flows converge on two international exit corridors: the Goma crossings into Rubavu for North Kivu material, and the Ruzizi bridges from Bukavu into Rusizi for South Kivu material. From Rwanda, tin and tantalum consolidate through facilities in the Kigali area and gold through Kigali gold-buying houses and a refinery there. Tantalum alone travels on by air and sea freight to processors in Asia and Central Asia.

The site data behind these maps come from independent mine-site visits between 2017 and 2025, mostly in 2021 and 2022, with area-level updates on who controls the ground, whether industry traceability tagging is running and which facilities have been sanctioned, drawn from public reporting through mid-2026. Sites are grouped by mineral, mining area, type and scale of working, processing method and downstream routing.

No sampled site is documented as sending material toward Uganda, Burundi or a domestic Congolese refining or export point. The flows differ in what is dug, how deep, whether mercury is used and who holds the ground. They do not differ in where the material goes.

All thirteen flows: six mining areas in North and South Kivu converge on the Goma crossings and the Ruzizi bridges, then Kigali; tantalum continues to processors in Asia. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA MANIEMA TANZANIA Lake Kivu Lake Tanganyika Kahuzi-Biega National Park Masisi Walungu Uvira Tantalum only: air and sea freight to processors in China and Kazakhstan Twangiza Mwenga · Luhwindja · 1 flow Kaziba depot Nzibira Walungu · South Kivu · 4 flows Luhihi Kabare · South Kivu · 1 flow Katasomwa Kalehe · Kahuzi-Biega edge · 1 flow Nyabibwe Kalehe · South Kivu · 3 flows Rubaya / Bibatama Masisi · North Kivu · 3 flows Bukavu South Kivu · 10 flows Goma North Kivu · 3 flows Ruzizi I / II bridges Bukavu–Rusizi crossings Petite / Grande Barrière Goma–Rubavu crossings Kigali All 13 flows · tin smelter · gold refinery · 3T trade All thirteen flows · North and South Kivu Two corridors carry everything Six mining areas → Goma or Bukavu → two border crossings → Kigali Mining area (six) Depot Provincial city Border crossing Kigali consolidation Routes, width by number of flows Onward export (tantalum) 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Flow by flow

One map for each flow

Each flow opens with what it is and what its map shows. Then comes the map, with the facts beside it. The sections under the facts are closed until you open them; the icons mark what each one covers.

Flow 01 · North Kivu · Masisi

Rubaya coltan

Tantalum and niobium from the Rubaya / Bibatama complex

Coltan (tantalum-niobium ore) from the Rubaya pits reaches Goma, crosses into Rwanda at the Petite Barrière or Grande Barrière posts and is consolidated in Kigali for air and sea freight to processors in China and Kazakhstan. Scale runs from micro-sites of 15–50 workers to Gakombe's 2,000, and the wider Rubaya area produces roughly 1,000 tonnes of coltan a year. Rubaya has been under AFC / M23 control since 30 April 2024.

Flow 1: Rubaya coltan. Route Rubaya → Goma → Rubavu → Kigali → Asia. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Nyabibwe Katasomwa Luhihi Nzibira Twangiza Air and sea freight to tantalum processors in China and Kazakhstan Rubaya / Bibatama Masisi · North Kivu Goma North Kivu Petite / Grande Barrière Goma–Rubavu crossings Kigali Consolidation · onward export Flow 01 · North Kivu · Masisi Rubaya coltan Rubaya → Goma → Rubavu → Kigali → Asia Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material Onward export 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Ta / Nb (+Sn)
Mining area
Rubaya / Bibatama mining complex
Miners per site
15–2,000
Mechanisation
Artisanal to semi-mechanised
Chemical processing
None (physical only)
End node
Tantalum processors in China and Kazakhstan

Mining method

The method is artisanal eluvial and alluvial pit digging on weathered pegmatite, the classic Rubaya coltan geology. Miners dig shallow pits, 0–27 m, by hand with picks, shovels and hoes. Some sites report semi-mechanised status, with small water pumps feeding on-site washing plants (sluice boxes and jigs). No blasting or mechanised earth-moving is recorded at any site in this flow.

Scale and equipment

Workforces span a wide range, from micro-sites of 15–50 workers up to Gakombe's 2,000. Gakombe alone is credited with a meaningful share of the roughly 1,000 tonnes a year of coltan the wider Rubaya area produces. Current reporting puts that output above 15% of world tantalum supply.

Equipment is hand tools, machetes for the pegmatite, gravity sluices and hand-pumped water at the larger semi-mechanised sites. There are no crushers and no chemical reagents.

Processing

Processing is physical concentration only. Washing, panning and gravity separation raise run-of-mine pegmatite to a columbite-tantalite pre-concentrate of roughly 20–40% Ta₂O₅, consistent with typical Congolese pre-concentrate grades. Export-grade Great Lakes coltan concentrate typically reaches 25–30% Ta₂O₅ after further consolidation.

Transport

Material moves by head-load or porterage, then by motorbike or light vehicle to a nearby road head. The trip is typically under two hours even in the wet season, given Rubaya's relatively developed local roads. Material is sold at the mine-mouth trading centres of Rubaya town or at smaller satellite depots (Kibabi, Karuba).

From Rubaya it moves about 40 km by road to Goma. It crosses into Rwanda at the Petite Barrière (pedestrian and motorbike, the higher-volume small-trade post) or the Grande Barrière (vehicle) posts between Goma and Rubavu.

Downstream

From the Kigali-area consolidation point the concentrate is exported to Asia. Historically the destination was a processor in Thailand. Public reporting for 2025–2026 points to tantalum processors in Shizuishan (Ningxia) and Jiujiang (Jiangxi) in China, and to the Ulba Metallurgical Plant in Kazakhstan.

The end products are refined tantalum metal powder, tantalum oxide and capacitor-grade tantalum. By that stage the material has lost every marker of its Congolese origin unless a supply-chain due-diligence record travelled with it.

Governance context

Masisi was declared a formal red zone in February 2025, with a six-month extraction and sales ban. The M23 / AFC movement has controlled Rubaya since 30 April 2024. Pit collapses in January and March 2026 killed more than 600 people.

Some sites have shifted from an earlier green or yellow validation status to red, not validated, in late-2025 revisits, reflecting the collapse of formal traceability under armed-group control.

Sampled sites (workers)

  • Gakombe 2,000
  • Mutanga 95
  • Kavuta 50
  • Kahenerezo 50
  • Kashaki 45 · tin-primary
  • Kalindi 35
  • Kiluku 15

Flow 02 · North Kivu · Masisi

Rubaya cassiterite

Tin as a co-product of the Rubaya coltan trade

Tin from the Rubaya / Bibatama mining complex in Masisi moves through Rubaya town or an outlying depot to Goma. It crosses into Rwanda at Rubavu and ends at a tin smelter in Kigali. Tin here rides on the coltan trade, so read this flow with the Rubaya coltan flow.

Flow 2: Rubaya cassiterite. Route Rubaya → Goma → Rubavu → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Nyabibwe Katasomwa Luhihi Nzibira Twangiza Rubaya / Bibatama Masisi · North Kivu Goma North Kivu Petite / Grande Barrière Goma–Rubavu crossings Kigali Tin smelting · Kigali Flow 02 · North Kivu · Masisi Rubaya cassiterite Rubaya → Goma → Rubavu → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Sn (+Ta)
Mining area
Rubaya / Bibatama mining complex
Miners per site
16–1,020
Mechanisation
Semi-mechanised
Chemical processing
None
End node
Tin smelter, Kigali

Mining method

The pits are alluvial, eluvial and tailings-reworking, with some vein and tunnel workings up to 27 m deep. Work is semi-mechanised: small pumps and sluice or washing plants supplement hand digging. A mining cooperative is present at essentially every site, giving basic organisational structure to otherwise informal digging.

Scale and equipment

Medium to large, from 16 workers up to 1,020 at the largest site, Nyagisenyi. The size reflects cassiterite's status as a co-product alongside the area's primary coltan output. Miners use hand tools, plus pump-fed washing and jigging equipment at the semi-mechanised sites. No crushers and no chemical reagents are recorded.

Processing

Physical concentration only: hand crushing, washing and panning produce a cassiterite concentrate of roughly 65% tin, the standard Congolese artisanal export grade. International tin concentrate trade runs at 65–75% tin; below 60% it trades at a discount to spot.

Transport

Concentrate travels by porterage or motorbike to Rubaya town or a satellite depot (Ngungu, Luwowo). From there it goes by road to Goma, then through the Petite Barrière or Grande Barrière crossings into Rwanda. This is the same corridor as the Rubaya coltan flow.

Downstream

Public reporting links Rubaya cassiterite to consolidation in Kigali and to tin smelting in the Karuruma / Jabana industrial area of Gasabo District. That area is home to one of the region's principal tin smelters. The end product is refined tin ingots for the international solder, electronics and packaging market.

Governance context

The flow shares the wider Rubaya context: the red-zone declaration for Masisi in February 2025 and AFC / M23 control of Rubaya since April 2024. Some revisited sites in the complex have lost their validated status.

Sampled sites (workers)

  • Nyagisenyi 1,020
  • Luwowo / Gasasa 519
  • Rukaza 300
  • Mufunzi 40
  • Katembe 26
  • Bishasha 20
  • Bihula 2 20
  • Mufunzi / Rutarishongo 16

Flow 03 · North Kivu · Masisi

Rubaya wolframite

A minor tungsten output beside the coltan and tin

Porters carry wolframite, a tungsten ore, from the Bishasha and Katembe pits to Rubaya or Ngungu, and it continues by road to Goma. It enters Rwanda at the Goma–Rubavu crossings and ends with regional 3T traders in Kigali. It is a minor secondary output of a complex whose primary minerals are coltan and cassiterite, with no refiner of its own documented.

Flow 3: Rubaya wolframite. Route Rubaya → Goma → Rubavu → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Nyabibwe Katasomwa Luhihi Nzibira Twangiza Rubaya / Bibatama Masisi · North Kivu Goma North Kivu Petite / Grande Barrière Goma–Rubavu crossings Kigali 3T trade consolidation Flow 03 · North Kivu · Masisi Rubaya wolframite Rubaya → Goma → Rubavu → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
W (+Sn)
Mining area
Rubaya / Bibatama mining complex
Miners per site
20–26
Mechanisation
Artisanal
Chemical processing
None
End node
Regional 3T traders, Kigali

What it is

Wolframite is a minor secondary output of the Rubaya / Bibatama complex beside its primary coltan and cassiterite. Two sampled sites carry it: Bishasha as the primary mineral, Katembe alongside tin. Miners work artisanal to semi-mechanised eluvial and vein pits with hand tools.

Processing

The ore is processed to a wolframite concentrate of roughly 60% WO₃, and no chemical processing is recorded. The mineral's mineral maximum is about 76.5% WO₃.

Transport

Method and routing are identical to the Rubaya coltan and cassiterite flows: porterage to Rubaya or Ngungu, road to Goma, then the Goma–Rubavu crossings into Rwanda.

Downstream

No dedicated downstream refining node is documented for this small volume. The concentrate consolidates with the broader Rubaya–Goma–Kigali tin and tantalum trade through regional 3T traders.

Sampled sites (workers)

  • Bishasha 20 · tungsten-primary
  • Katembe 26 · tungsten beside tin

Flow 04 · South Kivu · Walungu

Nzibira cassiterite

Deep tin workings on titled ground in Walungu

Tin from Nzibira in Walungu, South Kivu, is sold at a local depot and travels to Bukavu. It crosses the Ruzizi I or Ruzizi II bridges into Rusizi, then Kigali, ending with Rwandan tin traders and smelters. The workings run deep, up to 120 m, on titled ground, and Nzibira fell to AFC / M23 on 21 September 2025.

Flow 4: Nzibira cassiterite. Route Local depot → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Nyabibwe Katasomwa Luhihi Twangiza Nzibira Walungu · South Kivu Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Rwandan tin trade Flow 04 · South Kivu · Walungu Nzibira cassiterite Local depot → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Sn
Mining area
Nzibira strategic mining locality
Miners per site
30–600
Mechanisation
Semi-mechanised
Chemical processing
None
End node
Rwandan tin traders and smelters

Mining method

The deposits are alluvial and vein-hosted, worked through both open pits and hard-rock tunnels of considerable depth, up to 120 m at Mushangi. That is deeper and more industrially structured than the Rubaya coltan pits, and consistent with Nzibira's status, alongside neighbouring Twangiza, as a major strategic mineral hub.

Nearly all sites sit on ground recorded in the public mining cadastre as industrial exploitation permits, or in instituted artisanal exploitation zones. The permits are principally the Twangiza Mining SA concession (PE-44) and neighbouring registered titles (PE-40, PE-42, PE-68). In practice that ground is worked by artisanal miners. The legal basis for their presence varies by site and is not assessed here.

Scale and equipment

30–600 workers per site, from Mushebeyi at the small end to Misheke at the large, consistently classified as semi-mechanised. Equipment is hand tools for digging and tunnelling, plus washing and jigging equipment for on-site concentration. No crushers and no chemical processing are recorded.

Processing

Processing is physical concentration only, by crushing, washing and panning. The product is a cassiterite concentrate of about 65% tin. No chemical step is recorded for this flow.

Transport

Head-load or porterage from the mine, then motorbike or light vehicle to the road head. That leg is generally under two hours, though remote sites such as Irambo exceed two hours in both seasons. Material is first sold at a local depot (Nzibira, Lubuhu or Luntukulu).

From the depot it travels 37–52 km to Bukavu, depending on the site. It then crosses the Ruzizi River into Rwanda over the Ruzizi I or Ruzizi II bridges between Bukavu and Rusizi.

Downstream

Consolidated into the Rwandan tin trade. No single named smelter is specified for this flow, in contrast to the Rubaya corridor's explicit smelter linkage. That reflects more diffuse handling by Bukavu and Rwandan trading houses.

Governance context

A critical break in the chain of custody. The industry tin, tantalum and tungsten tagging scheme (ITSCI) suspended tagging across Kabare, Mwenga and Walungu territories on 3 September 2025. That was eighteen days before AFC / M23 captured Nzibira on 21 September 2025.

Nzibira and Twangiza together are assessed to have brought roughly half of South Kivu's cassiterite and coltan output, and more than two-thirds of its wolframite, under AFC / M23 control. That material now moves with no formal chain-of-custody validation.

Sampled sites (workers)

  • Misheke 600
  • Sebwa-Lukoma 383
  • Tchosho 300
  • Mushangi 150
  • Kilima Kwale 100
  • Kachuba 83
  • Tchembeke 80
  • Mahamba 80
  • Muhinga 70
  • Colline 6 65
  • Colline 1 60
  • Irambo 50
  • Luntukulu 40
  • Mushebeyi 30

Flow 05 · South Kivu · Walungu

Nzibira wolframite

Tungsten from the same pits and depots as the tin

Tungsten ore (wolframite) from the Nzibira mining area in Walungu is sold at the local depots, travels to Bukavu and crosses the Ruzizi bridges into Rwanda, where it ends with Rwandan tungsten traders. It comes from the same concessions and passes through the same depots as the Nzibira tin, not from a separate operation.

Flow 5: Nzibira wolframite. Route Local depot → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Nyabibwe Katasomwa Luhihi Twangiza Nzibira Walungu · South Kivu Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Rwandan tungsten trade Flow 05 · South Kivu · Walungu Nzibira wolframite Local depot → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
W (+Sn)
Mining area
Nzibira strategic mining locality
Miners per site
50–120
Mechanisation
Semi-mechanised
Chemical processing
None
End node
Rwandan tungsten traders

Mining method

Mining, workforce structure, equipment and transport are identical to the Nzibira tin flow: the same concessions, the same depots and the same Bukavu–Ruzizi crossing into Rwanda. Tungsten is the primary mineral at Bushushu and a secondary output beside tin at the other sites.

Processing

Wolframite is processed to a concentrate of about 60% WO₃. Nyampeho stands out as the only high-mechanisation site in the Nzibira cluster, though still with no chemical processing on site.

Transport

Wolframite has no route of its own. It follows the tin: the same local depots, then Bukavu, then the Ruzizi I or Ruzizi II bridges into Rwanda, where it joins the Rwandan tungsten trade rather than any single named refiner.

Governance context

Governance follows the tin. The industry tagging suspension of 3 September 2025 and the AFC / M23 capture of Nzibira on 21 September 2025 apply to the wolframite as they do to the cassiterite. Nzibira and Twangiza together are assessed to have brought more than two-thirds of South Kivu's wolframite output under AFC / M23 control.

Sampled sites (workers)

  • Bushushu 50 · tungsten-primary
  • Chaminyago 120
  • Zolazola 120 · arsenic pathfinder
  • Kilima Kwale 100
  • Colline 1 60
  • Luntukulu 40
  • Nyampeho 50 · mechanised

Flow 06 · South Kivu · Walungu

Nzibira artisanal gold

Shallow panning under a mixed security overlay

Gold dust panned in the Nzibira mining area moves through a local depot to Bukavu, crosses the Ruzizi bridges into Rwanda and ends in Kigali with the Rwandan gold-buying network. Unlike the deeper tin and tungsten tunnels around it, this is shallow work with no mercury recorded, and an armed-actor presence is reported at two of its five sites.

Flow 6: Nzibira artisanal gold. Route Local depot → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Nyabibwe Katasomwa Luhihi Twangiza Nzibira Walungu · South Kivu Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Gold-buying houses · refinery Flow 06 · South Kivu · Walungu Nzibira artisanal gold Local depot → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Au
Mining area
Nzibira strategic mining locality
Miners per site
30–100
Mechanisation
Artisanal to semi-mechanised
Chemical processing
None (panning)
End node
Rwandan gold-buying network

Mining method

The gold is recovered by shallow alluvial and eluvial open-pit and hydraulic working, 3–20 m deep. This is distinct from the deeper tin and tungsten tunnels elsewhere in Nzibira.

Processing

No mercury or other chemical processing is recorded at these sites. Recovery is by physical panning and washing only, yielding standard fine gold dust of about 91% purity. Congolese artisanal gold typically runs 88–94% fine and trades at a 5–20% discount to spot.

Transport

Gold dust leaves through a local depot at Nzibira, Bwahungu, Lubimbe or Kankinda, travels to Bukavu and then crosses the Ruzizi bridges into Rwanda, bound for Kigali.

Downstream

The gold consolidates into the general Bukavu gold-buying network en route to Rwanda, and on into the Rwandan gold-buying network. No site-specific refinery is named for this cluster, though the area-level linkage to the Kigali gold refinery applies as it does across South Kivu artisanal gold generally.

Security context

Two of the five sites report an armed-actor presence: a Raïa Mutomboki militia at Kanosho, and irregular elements of the national army (FARDC) at Chidira. This mixed state and non-state security overlay is typical of South Kivu artisanal gold sites. It predates the September 2025 AFC / M23 capture of Nzibira.

Sampled sites (workers)

  • Kanosho 100 · militia present
  • Chinda-2 85
  • Chidira 60 · irregular army elements weekly
  • Nyamugengula-1 45
  • Nyamugengula-2 30 · artisanal

Flow 07 · South Kivu · Walungu

Nzibira mechanised gold

A 300 m hard-rock working with mercury at the mine

Gold from the Namadava working in the Nzibira mining area leaves through the Kankinda depot and Bukavu for Rwanda. Depth, mechanisation and mercury set it apart from the shallow panning sites around it.

Flow 7: Nzibira mechanised gold. Route Kankinda → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Nyabibwe Katasomwa Luhihi Twangiza Nzibira Walungu · South Kivu Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Gold-buying houses · refinery Flow 07 · South Kivu · Walungu Nzibira mechanised gold Kankinda → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Au (+Sn)
Mining area
Nzibira strategic mining locality (Namadava)
Miners per site
50
Mechanisation
Mechanised
Chemical processing
Mercury amalgamation on site
End node
Bukavu refining · Rwanda

What sets it apart

Namadava is the deepest and most mechanised gold operation in the Nzibira cluster: a primary vein, hard-rock working with tunnels reaching 300 m, classified at the highest mechanisation level.

Processing

Unlike the shallow panning operations of the Nzibira artisanal gold flow, Namadava records mercury use for gold amalgamation directly at the mine, on-site chemical processing beyond simple gravity concentration.

Transport

Output is routed to the Kankinda depot, then to Bukavu, then across the Ruzizi I or Ruzizi II bridges into Rwanda. The recorded end node for this flow is Bukavu refining or Rwanda.

Governance context

The same tagging suspension and the AFC / M23 capture of Nzibira on 21 September 2025 apply to Namadava as to the rest of the mining area.

Sampled sites (workers)

  • Namadava 50 · gold-primary, tin-secondary

Flow 08 · South Kivu · Mwenga

Twangiza industrial gold

A licensed industrial concession worked by artisanal hands

Gold leaves the Twangiza concession in Mwenga for the Kaziba depot, then Bukavu and the Ruzizi bridges into Rwanda; public reporting links it onward to a gold refinery in Kigali. It is a formally licensed industrial concession worked by artisanal and semi-mechanised crews, with mercury recorded at every sampled site. AFC / M23 holds the ground as of 2025–2026 reporting.

Flow 8: Twangiza industrial gold. Route Kaziba → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Nyabibwe Katasomwa Luhihi Nzibira Twangiza Mwenga · Luhwindja Kaziba depot Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Gold refinery Flow 08 · South Kivu · Mwenga Twangiza industrial gold Kaziba → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Depot Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Au (+Cu)
Mining area
Twangiza industrial gold mine, Luhwindja chiefdom
Miners per site
80–250
Mechanisation
Semi-mechanised (industrial concession)
Chemical processing
Mercury amalgamation on site
End node
Gold refinery, Kigali

Mining method

Miners work alluvial and vein deposits through open pits and tunnels up to 20 m deep. The public mining cadastre records the ground as held under the Twangiza Mining SA concession (permit PE-42). Administratively this is Mwenga territory, not Walungu, despite its proximity to Nzibira. It is formally licensed as a large-scale industrial gold project. According to the mine-site visits, its ground is nonetheless worked by artisanal and semi-mechanised labour rather than heavy industrial machinery.

Scale and equipment

Sites have 80–250 workers: Madirha 250 on gold and copper, Changoboka 106 and Malinji 80. The mine-site visits classify all three as semi-mechanised and record no heavy industrial machinery on the ground.

Processing

Mercury amalgamation is confirmed on site at every sampled Twangiza site; the representative sites are Madirha, Changoboka and Malinji. This is a materially different and more hazardous processing method than the simple panning used at most Nyabibwe and Nzibira gold sites.

Transport

Gold moves from the mine to the Kaziba depot, roughly 120 km or more by porterage, motorbike and road. From Kaziba it continues to Bukavu and then over the Ruzizi bridges into Rwanda.

Downstream

The Kigali refinery that public reporting links to this cluster's gold was designated by the European Union on 17 March 2025 and by the US Treasury (OFAC) on 25 June 2026 under Executive Order 13413. Both designations cite the processing of conflict-linked gold.

Governance context

AFC / M23 holds the site as of 2025–2026 reporting. The concession holder alleged in late June 2025 that unidentified Rwandan nationals had assumed full control of operations. The national army's only recorded presence is as an air and drone striker, with strikes on 15 and 23 October 2025. This indicates the state has lost physical control of the ground.

On 22 May 2026 the DRC Ministry of Mines ordered a three-month suspension of gold and coltan mining across Mwenga and Shabunda territories. The order covers industrial, semi-industrial and artisanal sites alike. It is backed by a special inspection mission to verify legal status and check for armed-group revenue diversion. Enforceability in AFC / M23-held territory is doubtful.

Sampled sites (workers)

  • Madirha 250 · gold and copper
  • Changoboka 106
  • Malinji 80

Flow 09 · South Kivu · Kalehe

Nyabibwe artisanal gold

Twelve shallow sites along the RN2 road

Gold from twelve shallow sites around Nyabibwe passes through a local depot and Bukavu, crosses the Ruzizi bridges into Rwanda and is reported to end in Kigali. There, a gold refinery and tin smelter share one industrial area. The pits are typically 2–5 m deep, gold is panned without chemicals, and the area is under AFC / M23 control.

Flow 9: Nyabibwe artisanal gold. Route Local depot → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Katasomwa Luhihi Nzibira Twangiza Nyabibwe Kalehe · South Kivu Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Gold refinery · tin smelter Flow 09 · South Kivu · Kalehe Nyabibwe artisanal gold Local depot → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Au
Mining area
Nyabibwe
Miners per site
6–150
Mechanisation
Artisanal to semi-mechanised
Chemical processing
None (panning)
End node
Gold refinery and tin smelter, Kigali

Mining method

The sites are shallow eluvial and alluvial open-pit workings, 2–5 m typical depth, with occasional panning directly in rivers or streams. Nyabibwe, on the RN2 road, is a recognised commercial hub that also produces cassiterite and coltan. The sites are classified semi-mechanised despite the shallow, manual character of the work, reflecting organised cooperative involvement rather than heavy equipment.

Scale and equipment

Workforces at the twelve sites range widely, from micro (6 workers at Kanyanja) to small and medium (150 at Kahirenge), the largest site in the group.

Processing

No chemical processing takes place at these sites. The material is crushed, washed and panned only, and the result is fine gold dust of about 91% purity.

Transport

Gold goes first to a local depot at Nyawarongo, Mwamidjui, Katasomwa or a similar point. From there it is 27–56 km to Bukavu, then across the Ruzizi bridges into Rwanda.

Downstream

Public reporting links the broader Nyabibwe / Kalimbi mining area to both tin smelting and gold refining in the Karuruma / Jabana area of Gasabo District, Kigali. The same industrial cluster is reported to handle South Kivu tin and gold once material crosses the border.

Governance context

Kalehe was declared a formal red zone in February 2025, with a six-month extraction and sales ban. AFC / M23 controls Nyabibwe and the adjacent Kalimbi mine, putting the group within roughly 70 km of Bukavu. One site, Kitendebwa, records a Raïa Mutomboki militia presence.

Sampled sites (workers)

  • Kahirenge 150
  • Kaitolea Cabangi 65
  • Checheni 60
  • Nyawarongo 50
  • Witende 45
  • Chamishasha 40
  • Lijiwe-2 / Mbesho 30
  • Mwamidjui 30
  • Chabangi 25
  • Kironge 20
  • Kitendebwa 20 · militia present
  • Kanyanja 6

Flow 10 · South Kivu · Kalehe

Nyabibwe mercury gold

Two Kasese sites where amalgamation is recorded

Gold from two Kasese sites in the Nyabibwe area passes local depots and Bukavu, crosses the Ruzizi bridges into Rwanda and ends at a gold refinery in Kigali. What sets it apart is mercury: both sites record amalgamation on site, and one of them is primarily a tin working.

Flow 10: Nyabibwe mercury gold. Route Local depot → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Katasomwa Luhihi Nzibira Twangiza Nyabibwe Kalehe · South Kivu Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Gold refinery Flow 10 · South Kivu · Kalehe Nyabibwe mercury gold Local depot → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Au
Mining area
Nyabibwe (Kasese)
Miners per site
30–50
Mechanisation
Semi-mechanised
Chemical processing
Mercury amalgamation on site
End node
Gold refinery, Kigali

Mining method

Mining method and depth are similar to those of the artisanal gold flow from the same Nyabibwe area: shallow eluvial and vein workings, 2–3 m deep.

Processing

Both Kasese sites explicitly record mercury use for gold amalgamation. Kasese 1 shows amalgamation although its primary recorded mineral is cassiterite, suggesting mixed-mineral processing at the same physical location.

Transport

Material leaves the mining area through two local depots, Nyamukubi and Nyamugali. From the depots it travels to Bukavu, then over the Ruzizi I or Ruzizi II bridges into Rwanda, heading for Kigali.

Downstream

The two Kasese sites are linked to the same Kigali smelter and refinery as the Nyabibwe artisanal gold flow: the tin smelter at Karuruma in Gasabo District, Kigali, and a gold refinery in Kigali. Kasese 1 lies 133.7 km from Kigali.

Sampled sites (workers)

  • Kasese 2 50 · gold-primary, mercury recorded
  • Kasese 1 30 · tin-primary, amalgamation recorded

Flow 11 · South Kivu · Kalehe

Nyabibwe cassiterite / coltan

Tin-tantalum co-production at small scale

Tin ore (cassiterite) from the Nyabibwe mining area, with tantalum as a co-product, is sold at a local depot. It moves via Bukavu into Rwanda and ends at a tin smelter in Kigali. The flow is small-scale tin and tantalum co-production, with an armed presence recorded at even its minor sites.

Flow 11: Nyabibwe cassiterite / coltan. Route Local depot → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Katasomwa Luhihi Nzibira Twangiza Nyabibwe Kalehe · South Kivu Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Tin smelting · Kigali Flow 11 · South Kivu · Kalehe Nyabibwe cassiterite / coltan Local depot → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Sn (+Ta)
Mining area
Nyabibwe
Miners per site
30–35
Mechanisation
Semi-mechanised
Chemical processing
None
End node
Tin smelter, Kigali

What it is

At these Nyabibwe sites, tin (cassiterite) is either the primary output or a significant secondary alongside gold. At smaller scale, they mirror the Rubaya area's characteristic tin and tantalum co-production. Processing is physical concentration only.

Transport

Lijiwe's output is sold at the Katasomwa depot. From there the material follows the standard Bukavu–Rwanda route, which for South Kivu material means the Ruzizi I or Ruzizi II bridges, towards the tin smelter in Kigali.

Downstream

In Rwanda the material goes to the tin smelter in Kigali, the end point of this flow. The physically concentrated cassiterite from the Nyabibwe sites is smelted into tin there.

Security context

A Nyatura armed-group presence is recorded daily at Mubwahi. Lijiwe has a historic permanent national-army presence. Both point to Nyabibwe's persistent multi-actor security overlay, even at its smaller, less strategically significant sites.

Sampled sites (workers)

  • Lijiwe 35 · tin-primary, tantalum-secondary
  • Bikunda 50 · gold-primary, tin-secondary, no cooperative
  • Mubwahi 35 · gold-primary, tin-secondary, militia present daily

Flow 12 · South Kivu · Kabare

Luhihi artisanal gold

Hard-rock gold closed and re-organised by the de facto authority

Gold from the Luhihi hard-rock tunnels moves to the Kajabwe depot, on to Bukavu, over the Ruzizi bridges into Rwanda and to the gold refinery in Kigali. What sets it apart is control: the de facto authority shut the site down completely and tied any reopening to the registration of diggers.

Flow 12: Luhihi artisanal gold. Route Kajabwe → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Nyabibwe Katasomwa Nzibira Twangiza Luhihi Kabare · South Kivu Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Gold refinery Flow 12 · South Kivu · Kabare Luhihi artisanal gold Kajabwe → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Au
Mining area
Luhihi mining area
Miners per site
37–500
Mechanisation
Semi-mechanised
Chemical processing
None
End node
Gold refinery, Kigali

Mining method

Luhihi is worked as a primary vein, hard-rock deposit through tunnels and galleries, unlike the shallow alluvial and eluvial gold pits typical elsewhere in South Kivu. It is closer to the Twangiza industrial-gold geology than to Nyabibwe's placer-style panning.

Processing

Recorded processing in the Luhihi mining area is limited to washing and panning of the mined material. No chemical treatment is recorded for this flow. The recorded processing is therefore physical separation only, with no chemical stage.

Transport

Material leaves the mine for the Kajabwe depot, 2.8–3.3 km away, then about 27 km to Bukavu. From Bukavu it crosses the Ruzizi bridges into Rwanda.

Downstream

Crushers at or adjacent to the Lomera-Luhihi site itself process the ore first. The gold is sold through Bukavu gold-buying houses (comptoirs) before final refining at the gold refinery in Kigali.

Governance context

AFC / M23 control here follows a distinct pattern. Rather than simply taxing existing artisanal activity, AFC / M23 closed the Luhihi site outright on 30 August 2025 and definitively on 4 November 2025. Any reopening was conditioned on the formal registration of individual diggers. The UN Group of Experts assesses this as an intent to displace the existing artisanal workforce in favour of semi-mechanised exploitation run directly by the de facto authorities. That is a qualitatively different model from the tax-and-let-operate approach seen at most other sampled sites.

AFC / M23 has also replaced state mining-service functions with its own local mining bureau, which grades ore, inspects pits and supervises the quantities moved to the crushers.

Sampled sites (workers)

  • Nyenyezi 500
  • Nyabihanga 37

Flow 13 · South Kivu · Kalehe

Katasomwa cassiterite

Tin at the edge of Kahuzi-Biega National Park

Tin from Katasomwa, beside Kahuzi-Biega National Park, moves through the Bitale depot to Bukavu, crosses the Ruzizi bridges into Rwanda and runs to Kigali, ending with Rwandan tin traders. Context sets it apart: an area better known regionally for gold, the Katasomwa gold-mining village taken by M23 on 29 April 2025, and site activity not confirmed in person.

Flow 13: Katasomwa cassiterite. Route Bitale → Bukavu → Rusizi → Kigali. Map of North and South Kivu with the route from the mining area to Kigali. NORTH KIVU SOUTH KIVU RWANDA BURUNDI UGANDA Lake Kivu Kahuzi-Biega National Park Masisi Walungu Uvira Rubaya / Bibatama Nyabibwe Luhihi Nzibira Twangiza Katasomwa Kalehe · Kahuzi-Biega edge Bukavu South Kivu Ruzizi I / II bridges Bukavu–Rusizi crossings Kigali Rwandan tin trade Flow 13 · South Kivu · Kalehe Katasomwa cassiterite Bitale → Bukavu → Rusizi → Kigali Mining area in this flow Other sampled areas Provincial city Border crossing Kigali consolidation Route of the material 50 km

Base map outlines: Natural Earth, public domain. Mining areas, depots and crossings are placed to show the routing, not to survey accuracy.

Minerals
Sn
Mining area
Katasomwa, adjacent to the northern tip of Kahuzi-Biega National Park
Miners per site
50
Mechanisation
Semi-mechanised
Chemical processing
None
End node
Rwandan tin traders

What sets it apart

Katasomwa is better known regionally as a gold locality, yet the sampled site, Kainga, is tin-primary. It sits in a conservation-conflict zone, and illegal logging and charcoal production rose sharply around the adjacent national park through 2025.

Mining method

Eluvial (weathered in-situ) open-pit working at Kainga, the sampled site for this mining area. The pits are shallow, at about 10 m, and the working is semi-mechanised.

Processing

No chemical treatment is recorded at the site. Concentration is physical only, and the product leaving the mine is a cassiterite concentrate of about 65% tin.

Transport

The concentrate moves 0.7 km from the mine to the Bitale depot, then about 43 km to Bukavu. The Ruzizi bridges take it into Rwanda, where it consolidates with Rwandan tin traders.

Security context

M23 captured the Katasomwa gold-mining village on 29 April 2025 and still held it as of February 2026. The area also saw M23 clashes with Wazalendo from 12 October 2025.

Data quality

Activity status at Kainga is recorded as unconfirmed. The independent team that made the mine-site visits could not verify it in person because of insecurity. Most other sampled sites had their activity confirmed on the ground.

Sampled sites (workers)

  • Kainga 50 · activity unconfirmed

End product forms

What leaves, and what it becomes

MineralForm at the point of saleForm after refining
GoldRaw dust, about 91% fine, at the point of saleRefined gold bars or doré at the Kigali refinery
TinCassiterite concentrate, about 65% Sn, at the point of saleRefined tin ingots at the Kigali smelter
TantalumColtan concentrate, about 25–30% Ta₂O₅, at the point of saleRefined tantalum metal powder or oxide at Chinese or Kazakh processors
TungstenWolframite concentrate, about 60% WO₃, at the point of saleNo single named downstream refiner; consolidates into the Rwanda-based 3T trade

Sources and limits

Site-level data are drawn from independent mine-site visits recorded between 2017 and 2025, predominantly in 2021 and 2022. The 2025–2026 context (armed-group control, the tagging suspension, sanctions designations, ministry suspensions and red-zone classifications) comes from public reporting over the same period, including the UN Group of Experts on the DRC. Named facilities and companies appear only as they are named in that public record, and nothing on this page alleges wrongdoing by any of them.

This page is a structured synthesis of that record. We have not independently verified the underlying claims, and it should not be read as investigative confirmation. Map positions are schematic: mining areas, depots and crossings are placed to show the routing, not to survey accuracy. Base map outlines: Natural Earth (public domain).

What we do about it

Replace the channel with a record

Every flow on this page ends with material that has lost its origin. Our answer is a plant and a secured purchase gate at a green-validated source, a published price, and a chain of custody a buyer can audit. Bring us a flow you need to replace.

Talk to us
Two African workers shoveling crushed stone under a bright blue sky

Photo: Zach Wear · Unsplash